Commercial, Design Peer Review
AE provided structural and MEP design peer review services for the new Hattha Bank headquarters located along Hun Sen Blvd.
Year: 2021-2022Client: Hattha Bank Plc.Architect: CMEDContractor: CMEDProject Location: Phnom PenhSize: approx. 1.5ha project site with 22 floors tower, approx. 40,000 sqm
October 19, 2022
Commercial, Design coordination
Siem Reap East Gallery
Commercial, Design coordination
November 2, 2019
A modern and sustainable design of office building located in downtown Siem Reap.
Year: 2019Developer/owner: Urban Living SolutionsArchitect: Kite StudioProject Location: Siem ReapSize: 6 floors, approx. 16,500 sqm
November 2, 2019
Industrial, Projects, Structural Design, Structural Investigation of existing building, Visual Structural assessment of existing buildings
AE has provided factory inspections to some of the leading producers in the country due to their consistent adherence to the highest standards of work quality and ethics. Recently, AE was contracted by D' Luxe International to provide the first phase of the evaluation,...
October 28, 2022
Residential, Structural Design
AE provided structural design for the 30-story reinforced concrete residential tower featuring high-end condo units, a gym, pool facilities, and a rooftop garden. Tight access to the project site, and the relatively small footprint of the tower, proved challenging for the parking requirements. However,...
October 19, 2021
Commercial, Construction Supervision, Structural Design, Structure
A renovation of the existing building to a new flagship Starbuck store in central Phnom Penh. A complete set of structural plans was produced from the steel framing and slab components of the new building. The main challenge presented in this project was incorporating...
October 19, 2016
Construction Supervision, Design Peer Review, Institutions
A vocational training center for young mothers with children at Somrong Village, Sneung Commune, Banann District, Battambang Province. There are five buildings including an office building, a Skill training building, a daycare for children, a dormitory, and a conference Hall combined with a cafeteria....
October 19, 2014
Commercial, Structural Design
AEON Mall Café Street
Commercial, Structural Design
October 19, 2014
A new café street was designed from the steel frame and concrete foundations to support 14 different open structures supporting solar panels and glass canopies. Many were stand-alone structures, while several had to be supported off of...
October 19, 2014
Institutions, Project Management, Projects, Structural Design
AE provided detailed design and project management for a football center for Indo-china Starfish Cambodia (ISF). The project included 2 full-size soccer pitches, a training pitch, and small buildings for storage and sanitation facilities. AE was involved in the backfill work, design, tender, and...
October 19, 2014
Construction Supervision, Institutions, Project Management, Projects, Structural Design
AE provided consultancy services in both phases of the construction of this school. Phase 1 included 2 buildings, a two-story building with an open plan and an elliptical-shaped music building. Phase 2 included an identical building to extend from Phase 1. AE’s scope of...
October 19, 2014
Construction Supervision, Design Peer Review, Industrial
Greystone Factory
It is a single-story steel warehouse structure located in one of the biggest factory complexes along Veng Sreng road. AE was hired to provide a review of the structural design, construction quotation, and construction contract. AE also conducted ongoing inspections throughout the construction...
December 25, 2019