Sona2022-10-26T08:08:21+07:00
AE provided consultancy services in both phases of the construction of this school. Phase 1 included 2 buildings, a two-story building with an open plan and an elliptical-shaped music building. Phase 2 included an identical building to extend from Phase 1. AE’s scope of works included structural design, tendering...