Institutions, Projects, Structural Design
An office building located within the Ministry of Agriculture, made of reinforced concrete and steel structure on the roof level and around the façade.
Year: 2019Developer/Owner: FAO, UNDPArchitect: The Room Design StudioProject location: Phnom Penh
July 7, 2019
Construction Supervision, Design Peer Review, Industrial, Projects
A global factory that designs and manufactures sportswear such as shoes, clothing, and accessories. AE was contracted to review structural design and calculations to ensure that all structural specifications met the requirement of the Myanmar National Building Code. AE also performs site inspections during...
October 19, 2017
Construction Supervision, Industrial, Projects, Structural Design
Horseware Production Factory
Construction Supervision, Industrial, Projects, Structural Design
October 19, 2015
AE provided a design review and recommendation for the New Production Factory. In 2015, AE got another opportunity to provide other services to this client, including architectural, structural design & project management to improve the...
October 19, 2015
Commercial, Structural Design, Structural Investigation of existing building
The existing building was renovated to be an office and showroom. AE was hired to provide a basic structural investigation, a demolition plan, and complete structural design & construction drawings for an existing two-story structure along Russian Blvd in Phnom Penh. Since this building...
October 19, 2014
Civil Infrastructure, Project Evaluation, Projects
AE was engaged by Agence Française de Développement (AFD) to undertake the retrospective project evaluation, impact analysis and report writing on the Siem Reap/Angkor Urban Development Project. The original project was aimed at contributing to the implementation of directives for sustainable development of the...
October 19, 2014
Construction Supervision, Institutions, Project Management, Projects, Structural Design
AE provided consultancy services in both phases of the construction of this school. Phase 1 included 2 buildings, a two-story building with an open plan and an elliptical-shaped music building. Phase 2 included an identical building to extend from Phase 1. AE’s scope of...
October 19, 2014
Industrial, Projects, Structural Design, Structural Investigation of existing building, Visual Structural assessment of existing buildings
AE has provided factory inspections to some of the leading producers in the country due to their consistent adherence to the highest standards of work quality and ethics. Recently, AE was contracted by D' Luxe International to provide the first phase of the evaluation,...
October 28, 2022
Construction Supervision, Design Peer Review, Industrial
AE provided structural peer review and project management services for a steel-framed factory facility located on a 3.5-hectare site in Phnom Penh, Cambodia. This facility will supply products for Adidas and is one of the largest factory complexes along Veng Sreng Road. This project...
December 19, 2020
Industrial, Visual Structural assessment of existing buildings
AE performed a visual structural assessment, design for structural retrofit, and construction inspection for this factory warehouse located in Vattanak Special Economic Zone.
Year: 2014Client: Papillion Textile (Cambodia) Co., Ltd.Project Location: Phnom Penh
Size: 6,624sqm
October 19, 2014
Institutions, Project Management, Projects, Structural Design
AE provided detailed design and project management for a football center for Indo-china Starfish Cambodia (ISF). The project included 2 full-size soccer pitches, a training pitch, and small buildings for storage and sanitation facilities. AE was involved in the backfill work, design, tender, and...
October 19, 2014