Construction Supervision, Residential, Structural Design
This is a project that entailed the construction of commercial and residential wood structures, which were designed to reflect traditional Khmer styles and were therefore built using a combination of teak wood roof framing and cladding with reinforced concrete foundation and frame.
Year: 2017- 2018Client:...
October 19, 2018
Construction Supervision, Institutions, Structural Investigation of existing building
AE provided structural investigation and design for structural retrofits for the Japanese community school. The investigation involves two existing structures, a single-story steel warehouse and a multi-story concrete structure with a steel roof truss system.
Year: 2014Client: Japanese Association for Promotion of Education and Culture Business...
October 19, 2014
Commercial, Construction Supervision, Design coordination, Design Peer Review
SRE Gallery, Siem Reap
Urban Development Study, Siem Reap
Rose Apple Square (RAS)
Commercial, Construction Supervision, Design coordination, Design Peer Review
Project Periods:
AE provided structural peer review services and project management services for a 7-story building with post-tensioned concrete slabs, and 2 basement levels. This...
October 19, 2022
Construction Supervision, Design Peer Review, Industrial
AE provided structural peer review and project management services for a steel-framed factory facility located on a 3.5-hectare site in Phnom Penh, Cambodia. This facility will supply products for Adidas and is one of the largest factory complexes along Veng Sreng Road. This project...
December 19, 2020
Construction Supervision, Design Peer Review, Institutions, Project Management
This building, located in the Phnom Penh Economic Zone (PPSEZ), houses the Garment Manufacturers’ Association in Cambodia (GMAC) office and the Cambodian Garment Training Institute (CGTI), which provides skill training to Cambodian garment workers.
Year: 2014-2016Owner: Garment Manufacturers’ Association (GMAC)Contractor: Daun Penh ConstructionProject Location: Phnom...
October 19, 2016
Construction Supervision, Design Peer Review, Industrial
Greystone Factory
It is a single-story steel warehouse structure located in one of the biggest factory complexes along Veng Sreng road. AE was hired to provide a review of the structural design, construction quotation, and construction contract. AE also conducted ongoing inspections throughout the construction...
December 25, 2019
Commercial, Construction Supervision, Structural Design, Structure
A renovation of the existing building to a new flagship Starbuck store in central Phnom Penh. A complete set of structural plans was produced from the steel framing and slab components of the new building. The main challenge presented in this project was incorporating...
October 19, 2016
Construction Supervision, Design Peer Review, Industrial, Projects
A global factory that designs and manufactures sportswear such as shoes, clothing, and accessories. AE was contracted to review structural design and calculations to ensure that all structural specifications met the requirement of the Myanmar National Building Code. AE also performs site inspections during...
October 19, 2017
Construction Supervision, Residential
AE provided construction supervision services for this large mixed-use project consisting primarily of mid-rise reinforced concrete residential units located adjacent to road 60m near Siem Reap, Cambodia. The master plan for this project provides a neighborhood with high walkability and incorporates a modern interpretation...
October 19, 2022
Institutions, Project Management, Projects, Structural Design
AE provided detailed design and project management for a football center for Indo-china Starfish Cambodia (ISF). The project included 2 full-size soccer pitches, a training pitch, and small buildings for storage and sanitation facilities. AE was involved in the backfill work, design, tender, and...
October 19, 2014